Selected work
A closer look. A better payoff. From manufacturing floors to retail systems and research projects, these are examples of what happens when you look beyond the obvious problem, question a few assumptions, and find a better way to make things work.
01 / Retail · Technical assessment
A targeted intervention instead of a high-risk replacement project.
Retail · Technical assessment
Scaling Without the Rebuild
The challenge A retail platform needed to handle more customer traffic. A lot more. The proposed solution was a high-risk, three-month rebuild.
The approach I assessed the existing application and found a narrower path: a targeted rewrite that addressed the scaling constraint while preserving the surrounding system.
The payoff Throughput rose from fewer than 1,000 to more than 1,000,000 customers per hour. The work finished ahead of schedule and under budget, without the proposed rebuild.
02 / Services · AI & workflow design
More assessment capacity and faster feedback, without removing human judgment.
Services · AI & workflow design
AI-Assisted Grading with Human Oversight
The challenge A test-preparation provider wanted to expand its assessments and reduce the time learners waited for grading. The goal wasn't to replace human judgment. It was to make that judgment go further, faster.
The approach I built an LLM-powered grading microservice that connected to the existing application, incorporating human oversight and iterative model refinement into the assessment workflow.
The payoff Supported test scenarios grew from 4 to 40 and grading turnaround fell from approximately one week to under one hour—all while keeping human judgment central to the process.
03 / Manufacturing · Operations
Better coordination across measurement, scheduling, incoming work, and materials.
Manufacturing · Operations
Production Control That Scaled with Growth
The challenge A growing aerospace manufacturer was pushing the limits of its production-control systems across two facilities. Adding more people might have helped, but it wouldn't necessarily have fixed the underlying constraints.
The approach I introduced touch-time measurement, gave production teams more control over scheduling, improved visibility into incoming work, and standardized materials to make planning more predictable.
The payoff The improvements supported the business as it grew from $30 million to $60 million across two facilities, without adding production-control headcount.
04 / Data · Decision support
Connecting a large dataset to the questions analysts needed to investigate.
Data · Decision support
Exploring Eight Billion Simulation Events
The challenge A simulation dataset contained more than eight billion events. Analysts needed to explore how activity, assets, and resources changed across geography and time.
The approach I built an extensible visualization framework that connected geographic views, event histories, and resource data, allowing analysts to explore relationships across complex simulated scenarios.
The payoff Billions of simulation events became comprehensible through interactive visualizations. More importantly, so did the stories they told and the trends they revealed. Analysts could explore patterns, track resource usage, and understand how events unfolded across time and geography.